GK Irrigation Pumping Station - Civil & Building Works : |
|
|
|
GK Irrigation Pumping Station under Japan Debt Relief Fund in Kushtia |
|
Civil & Building Works on Turn-key basis involving |
|
Construction of Concrete lined Main Distribution Canal, Internal Road, |
|
Boundary-wall, Stock-pile Area for Treating Dredged Silts, |
|
Deep Water Wells (3 Nos.) for Industrial Water, Overhead Water Tank, |
|
Rehabilitation of Intake Structure and Irrigation Pumping Station with Electrical Lighting, |
|
Water Supply & Sewage Systems |
|
|
|
Client: Ebara Corporation, Japan |
|
Owner: Bangladesh Water Development Board |
|
|
|
|
|
|
|
GK Irrigation Pumping Station - Mechanical & Electrical works : |
|
|
|
GK Irrigation Pumping Station under Japan Debt Relief Fund in Kushtia |
|
Project work included Mechanical & Electrical works involving |
|
Assembly and Installation of Intake Control Elements (Sluice Gate, |
|
Stop-log & Bar screen), Installation of Sluice Gate Lifting Cranes, |
|
Installation of 3 Nos. 1,700m3/min. Axial-flow Pumps (2,800KW each), |
|
Instrumentation & Control System, Data-logger, |
|
Flow Measuring Device, Fire Detection System, |
|
Electrical Distribution & Receptacles System, Dredging Pump Barge, |
|
25t EOT Crane and Trash Rake Car/ Crane |
|
|
|
Client : Ebara Corporation, Japan |
|
Owner : Bangladesh Water Development Board |
|
|
|
|
|
|
|
|
|
Mymensingh Power Station (Phase-I) 2X35MW Gas Turbine (GE Frame-6) : |
|
|
|
Mymensingh Power Station (Phase-I): 2X35MW Gas Turbine (GE Frame-6) |
|
Project works involved : |
|
|
Civil & Architectural works on Turn-key basis involving Land Reclamation, & Site Filling & Compaction, Slope Protection Work with Geo-textile and Gravel baskets, Construction of Internal Road with side-walks, Boundary Fencing, Water Supply, Storm Water & Sewage Networks, Plant Site Main Switch Yard & Sub-station (11KV/132KV), City-end Grid Sub-station Extension, Pipe & Cable Rack, Cable Trench, Gas Pipe Trench, Make-up Deep Water Wells (3 Nos.), Gas Turbine (2X35MW, GE Frame-6) & Generator Barge Foundation, Fire Annunciation & Fire Fighting System, Main Warehouse & Workshop Building, Main Office Building, Engineer¡¯s Accommodation Building, Car Parking Sheds, Gate House & First Aid Station, Security Guard¡¯s Accommodation Building, Barge Access Canal & Plant Access Road from Highway (1.2KM), Black Start Generator, Plant Area Lighting and Landscaping |
|
|
|
|
Client : Consortiums of
MES Engineering & Shipbuilding Co. Ltd. (MES), Japan & European Gas Turbines (EGT), France |
|
Owner : Rural Power Company Limited |
|
|
|
|
|
|
|
Mymensingh Power Station (Phase-II) 2X35MW Gas Turbine (GE Frame-6) : |
|
|
|
Project works involved : |
|
|
Civil & Building Works on Turn-key basis involving Land Reclamation, Site Filling & Compaction, Slope Protection and Construction of Internal Roads, Storm Water System, Boundary Fencing, Pipe & Cable Rack, Cable Trench, Gas Pipe Trench and Rack, Gas Turbine (2X35MW, GE Frame-6) & Generator Foundation, Switch Yard & Sub-station (3X50MVA, 11KV/132KV), |
|
Overland Transportation Work : Gas Turbine (100 Tons each) & Generator (110 Tons each). From Kanchpur, Dhaka to Plant Site at Mymensingh which included Transportation of the consignment using a 96-wheeled Flat-bed Trailer |
|
|
|
|
Client : GE Energy Products, Europe (GEEP), Europe, Belfort, France. |
|
Owner : Rural Power Company Limited |
|
|
|
|
|
|
|